The Alqueva Dam is an
arch dam An arch dam is a concrete dam that is curved upstream in plan. The arch dam is designed so that the force of the water against it, known as hydrostatic pressure, presses against the arch, causing the arch to straighten slightly and strengthen ...
and the centrepiece of the Alqueva Multipurpose Project. It impounds the River
Guadiana The Guadiana River (, also , , ), or Odiana, is an international river defining a long stretch of the Portugal-Spain border, separating Extremadura and Andalusia (Spain) from Alentejo and Algarve (Portugal). The river's basin extends from the e ...
, on the border of Beja and
Évora District Évora District ( pt, Distrito de Évora ) is located in Alentejo, in southern Portugal. The district capital is the city of Évora. Municipalities The district is composed by 14 municipalities: * Alandroal * Arraiolos * Borba * Estremoz * Év ...
s in south of Portugal. The dam takes its name from the town of Alqueva to its right bank. It creates a large reservoir with an inter-annual regulation capacity from which water may be distributed throughout the region. The dam was completed in 2002 and its reservoir reached the full level, for the first time, in 2010. The power station was commissioned in two stages, stage I in 2004 and stage II in 2013. The Alqueva Dam is the largest dam and artificial lake () in Western Europe.


History

During the 1950s, the Portuguese Prime Minister,
António de Oliveira Salazar António de Oliveira Salazar (, , ; 28 April 1889 – 27 July 1970) was a Portuguese dictator who served as President of the Council of Ministers from 1932 to 1968. Having come to power under the ("National Dictatorship"), he reframed the re ...
, ordered a study of the feasibility of the dam project. The potential benefits of the Alqueva dam were discussed for decades. An initial effort was undertaken after the Carnation Revolution of 1974, but it was abandoned in 1978. The Portuguese government eventually made a firm decision to build the dam in the 1990s, during the Cavaco Silva and
António Guterres António Manuel de Oliveira Guterres ( , ; born 30 April 1949) is a Portuguese politician and diplomat. Since 2017, he has served as secretary-general of the United Nations, the ninth person to hold this title. A member of the Portuguese Socia ...
governments. Aldeia da Luz, a small village that lay in the projected flood zone of the dam, was completely rebuilt on a new site. The construction of the new dam was carried out by a joint venture of Bento Pedroso Construções, Cubiertas y MZOV,
Dragados ACS, Actividades de Construcción y Servicios, S.A. () is a Spanish company dedicated to civil and engineering construction, all types services and telecommunications. It is one of the leading construction companies in the world, with projects i ...
and Somague – Sociedade de Construções. On February 8, 2002, the high floodgates of the Alqueva dam were closed. In January 2010 the lake was filled to the planned level, with a surface area of 250 km2. Portugal opens Europe's largest dam
/ref> When filled to capacity, the shoreline of Alqueva Lake, also known as Grande Lago, is nearly 1200 kilometers and the maximum depth is about 100 meters. A well-developed commercial marina has grown-up to the southeast of the town of Amieira, which provides all types of boating services.


Hydroelectric power station

In 2004, the first stage of the hydroelectric power station was commissioned, with a capacity of . The second stage, with an additional 259 MW, was commissioned in 2013. The power station contains four reversible
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
s. With these turbines, the power station is afforded a
pumped-storage Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential ...
capability. Power is generated during high demand periods and at times of low demand, the turbines reverse and pump water from a much smaller reservoir below the dam back into the main reservoir. Pedrogao Dam forms the lower reservoir.


Supporting infrastructure

Complementing the Alqueva dam, which is equipped with a
pumped-storage Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential ...
hydroelectric plant, is the Pedrógão Dam, located downstream from Alqueva beside the settlement of the same name and also equipped with a mini hydroelectric plant. The purpose of the Pedrógão dam is the creation of a lower reservoir for the Alqueva, for the recovery of flows, also serving as a source of water for the Ardila and Pedrógão water supply subsystems. The Álamos pumping station takes water from Alqueva and distributes it throughout the entire Alqueva water supply subsystem. Another two pumping stations, Pedrógão/Left Bank and Pedrógão/Right Bank, distribute water to the Ardila and Pedrógão subsystems respectively. The main infrastructure also includes the primary and secondary networks, pumping stations, intermediate dams, reservoirs and drainage and road networks. A 5 MW
floating solar Floating solar or floating photovoltaics (FPV), sometimes called floatovoltaics, is solar panels mounted on a structure that floats on a body of water, typically a reservoir or a lake. The market for this renewable energy technology has grown rap ...
facility is also being installed, with an option for 70 MW more.


Benefits

The goals of the Alqueva Multi-Purpose Project have been based on the principal shortfalls of the Alentejo region. The answers to these needs make up the project's main goals: *The establishment of a strategic water reserve, with a capacity sufficient to meet all the needs of at least three successive years of drought; *Guaranteed water supply to the population, industries and agriculture within the project intervention area; *Amendment of the Cultural Agriculture Model, with the introduction of of a new irrigated crops in the Alentejo region; *The production of non-polluting electrical energy using renewable sources; *The preservation of the environment, monitoring and actively participating in the improvement of the same; *The promotion of quality tourism by means of cooperation with public and private entities, the execution of Land Use Plans and systematic efforts to ensure the sustainability of the interventions; *The creation of a new Corporate Climate, assuring the resource of "water", meeting the goals for the implementation of the project and helping to provide solutions for investment in the region; *The dynamization of the employment market, a direct consequence of the other goals, is vital to the reversal of the main regional statistical indicators.


Destruction

The dam caused the loss of prehistoric engravings and habitat of rare and endangered species including
eagle Eagle is the common name for many large birds of prey of the family Accipitridae. Eagles belong to several groups of genera, some of which are closely related. Most of the 68 species of eagle are from Eurasia and Africa. Outside this area, just ...
s,
kites A kite is a tethered heavier than air flight, heavier-than-air or lighter-than-air craft with wing surfaces that react against the air to create Lift (force), lift and Drag (physics), drag forces. A kite consists of wings, tethers and anchors. ...
,
wild boars The wild boar (''Sus scrofa''), also known as the wild swine, common wild pig, Eurasian wild pig, or simply wild pig, is a suid native to much of Eurasia and North Africa, and has been introduced to the Americas and Oceania. The species is n ...
, and the
Iberian lynx The Iberian lynx (''Lynx pardinus'') is a wild cat species endemic to the Iberian Peninsula in southwestern Europe. It is listed as Endangered on the IUCN Red List. In the 20th century, the Iberian lynx population had declined because of overhun ...
. A Roman fort was also submerged. The Alqueva Multi Purpose Project has a strong financial investment in impact mitigation plans. The archaeological intervention of about 1,200 cultural heritage sites is one result. An environmental leader, José Paulo Martins, said the dam is a waste of money, as "the government's own secret reports say only 48% of the irrigated land can be worked profitably".


Gallery

AlquevaDamPanorama.jpg, Panoramic view of dam and power station Alqueva_29_5_5.jpg, Jet from the flip bucket spillway


References


External links

;Official
EDIA – Empresa de Desenvolvimento e Infra-Estruturas do Alqueva
(Corporate website of the state company responsible for the management of Alqueva system)
Alqueva – A fresh new land
(Promotional website run by the state company responsible for the management of Alqueva system) ;Other
Alqueva.com



3D model
{{Authority control Dams completed in 2002 Energy infrastructure completed in 2004 Energy infrastructure completed in 2013 Dams in Portugal Pumped-storage hydroelectric power stations in Portugal Arch dams 2002 establishments in Portugal Buildings and structures in Évora District Buildings and structures in Beja District Guadiana